Foundation & footing excavation
Cut to plan for footings and foundations, clean walls, correct depth, ready for forms.
Foundation digs, footings, utility trenching, and mass excavation, tight clearances, safe spoil handling, clean handoff every time.
WHAT'S INCLUDED
Excavation sets up every trade that follows, first bucket to last trench.
Cut to plan for footings and foundations, clean walls, correct depth, ready for forms.
Water, sewer, storm, and dry-utility trenches cut to grade, backfilled to spec.
Bulk earth removal for basements, retention ponds, and large commercial pads.
Hauled off-site or stockpiled on-site, whichever keeps your schedule and budget intact.
Sloping, shoring, and trench boxes per OSHA requirements, every crew goes home safe.
Digging next to structures, utilities, and property lines without a damage claim.
30 to 45 minutes on the ground, an itemized quote within five business days.
Start with a free site walk →HOW IT WORKS
Every excavation project follows the same process, from first call to final walk.
We look, we listen, we measure the job in front of us. No charge.
Itemized scope and timeline within five business days, not five rounds of phone tag.
Permits pulled, crew and equipment on-site.
Work verified against plan. Documentation provided. Final walk with you.
EXCAVATION, ANSWERED
The questions owners and GCs ask most before an excavation job starts.
It depends on soil type, depth, access, and how much spoil must be hauled versus reused on-site. A footing dig and a basement excavation aren't priced the same. We walk the site first and give you an itemized number, not a phone-quote guess.
A typical residential foundation dig runs a few days; basement and larger commercial excavations run one to several weeks, depending on soil, dewatering, and shoring needs. You get a real schedule in writing after the site walk.
Excavation removes and shapes earth below the surface: footings, trenches, basements. Grading shapes the surface itself: cut-and-fill, pad prep, finish elevations. Most projects need both; we self-perform each. See Grading for the surface side.
WHY IT MATTERS
"This safety record and quality of this work is outstanding. He always stays behind his work. Every time we have an emergency he's there."Dave Almond, Miller Pipeline
Send us your plans. We'll walk the site with you, free, within five business days.
Request a quote →