SWPPP review & permitting
SWPPP review and VSMP permit coordination before a shovel hits the ground.
Erosion & sediment control isn't an afterthought. Done wrong, it stops your permit cold. Done right, it's the discipline we lead with.
WHAT'S INCLUDED
From SWPPP review to final stabilization, no handoffs.
SWPPP review and VSMP permit coordination before a shovel hits the ground.
Installed to spec, inspected on schedule, documented for your compliance file.
Check dams, inlet protection, and the full BMP set most contractors skip.
Campbell, Bedford, Amherst, Appomattox, built to local spec.
Get ahead of an inspection, or fix a failed one fast, no weeks-long wait.
Installed alongside grading and drainage work, not bolted on after.
30 to 45 minutes on-site, an itemized quote within five business days.
Start with a free site walk →HOW IT WORKS
Every stormwater project follows the same process, first call to final walk.
We look, listen, and measure the job in front of us. No charge.
Itemized scope and timeline within five business days, no phone tag.
Permits pulled, crew and equipment on-site.
Work verified against plan, documented, with a final walk together.
STORMWATER & VSMP, ANSWERED
The questions owners and GCs ask most before this kind of job starts.
Often, yes, Virginia's Stormwater Management Program requires a permit once a project disturbs a set amount of land (generally 2,500 square feet or more, though thresholds vary by locality), covering erosion control plus long-term stormwater management. We handle the SWPPP, permitting, and installation as part of the job.
The inspector issues a notice of corrective action with a deadline to fix the problem. Silt fence down, an unmaintained basin, and exposed soil are common findings. We offer same-week site visits to fix a failed inspection before it escalates to a stop-work order or fine.
Erosion & sediment control (E&SC) is short-term work during construction: silt fence, sediment basins, and stabilization that keep dirt on-site. Stormwater management is the long-term design controlling runoff rate and quality after construction. VSMP compliance covers both, and we handle both.
WHY IT MATTERS
"The crews were very nice, very in tune with each other. I was also very impressed with how much they give back to the community. When you meet people like that you just know they are fantastic people."Butch Goad, Machine Specialist, James River Equipment
Send your plans and we'll walk the site with you, free, within five business days.