Asphalt paving
Parking lots, drives, and roadways paved to spec, base to final lift.
Asphalt paving, concrete flatwork, driveways, parking lots, and sealcoating, one crew, base to surface.
WHAT'S INCLUDED
Pavement fails when the base underneath was never right. We control both.
Parking lots, drives, and roadways paved to spec, base to final lift.
Sidewalks, pads, and flatwork poured and finished to grade.
Residential and commercial driveways, gravel, asphalt, or concrete, built to last.
Full parking lot builds from subgrade through striping, sized for real traffic.
Sealcoat applied to protect and extend the life of existing asphalt.
ADA-compliant striping and markings, the last step, not an afterthought.
30 to 45 minutes on-site, an itemized quote within five business days.
Start with a free site walk →HOW IT WORKS
Every paving project follows the same process, from first call to final walk.
We look, we listen, and measure the job. No charge.
Itemized scope and timeline in five business days, no phone tag.
Permits pulled, crew and equipment on-site.
Work verified against plan. Documented. Final walk together.
PAVEMENT, ANSWERED
The questions owners and GCs ask most before this job starts.
It depends on square footage, base condition, and thickness required for the load, a driveway and a commercial lot aren't priced the same. We walk the site and give you an itemized number based on your actual base, not a per-square-foot guess.
Asphalt is typically drivable within 24 to 48 hours but takes weeks to cure, avoid heavy loads, tight turns, or parking in one spot. Concrete needs about a week before light traffic and a month for full strength. We'll give exact timing for your project.
Asphalt costs less up front, installs faster, and patches easier, but has a shorter lifespan and softens in heat. Concrete costs more up front but lasts longer and holds up better under heavy loads. We'll walk through the trade-offs during the free walk.
WHY IT MATTERS
"Every job has a week where something goes sideways. What sets Oxen Civil apart is they are always there for us. No surprises on change orders, no radio silence. When you're running five jobs at once, that's worth more than the invoice."Tom Nagle, Project Manager, Mr. Pave
Send us your plans. We'll walk the site with you, free, within five business days.
Request a quote →