Asphalt & Concrete Paving in Lynchburg, VA

Asphalt paving, concrete flatwork, driveways, parking lots, and sealcoating, one crew, base to surface.

Base-to-finish coverageLicensed & insuredLynchburg, VA and surrounding areas

WHAT'S INCLUDED

Base prep through final striping.

Pavement fails when the base underneath was never right. We control both.

Asphalt paving

Parking lots, drives, and roadways paved to spec, base to final lift.

Concrete flatwork

Sidewalks, pads, and flatwork poured and finished to grade.

Driveways

Residential and commercial driveways, gravel, asphalt, or concrete, built to last.

Parking lot construction

Full parking lot builds from subgrade through striping, sized for real traffic.

Sealcoating

Sealcoat applied to protect and extend the life of existing asphalt.

Striping & final markings

ADA-compliant striping and markings, the last step, not an afterthought.

Send us your plans.
We'll walk the site, free.

30 to 45 minutes on-site, an itemized quote within five business days.

Start with a free site walk →

HOW IT WORKS

Four steps.
No mystery.

Every paving project follows the same process, from first call to final walk.

Step 01

Free site walk

We look, we listen, and measure the job. No charge.

Step 02

A real quote

Itemized scope and timeline in five business days, no phone tag.

Step 03

Schedule & mobilize

Permits pulled, crew and equipment on-site.

Step 04

Final walk & sign-off

Work verified against plan. Documented. Final walk together.

PAVEMENT, ANSWERED

Quick answers, real ones.

The questions owners and GCs ask most before this job starts.

How much does asphalt paving cost in Lynchburg, VA?

It depends on square footage, base condition, and thickness required for the load, a driveway and a commercial lot aren't priced the same. We walk the site and give you an itemized number based on your actual base, not a per-square-foot guess.

How long does new pavement need to cure before use?

Asphalt is typically drivable within 24 to 48 hours but takes weeks to cure, avoid heavy loads, tight turns, or parking in one spot. Concrete needs about a week before light traffic and a month for full strength. We'll give exact timing for your project.

Asphalt vs. concrete: which is better for my driveway?

Asphalt costs less up front, installs faster, and patches easier, but has a shorter lifespan and softens in heat. Concrete costs more up front but lasts longer and holds up better under heavy loads. We'll walk through the trade-offs during the free walk.

WHY IT MATTERS

The surface only lasts as long as the base underneath it.

Virginia based Farther out? Talk to us. We may still reach you
5 days Typical turnaround for a written quote
1 crew Start to finish on your site

What clients say

Tom Nagle headshot
"Every job has a week where something goes sideways. What sets Oxen Civil apart is they are always there for us. No surprises on change orders, no radio silence. When you're running five jobs at once, that's worth more than the invoice."
Tom Nagle, Project Manager, Mr. Pave

Ready to get your pavement built right, base to finish?

Send us your plans. We'll walk the site with you, free, within five business days.

Request a quote →